Connect with us

Energy

Total commences production from the Egina field

Published

on

Total has started up production on December 29, 2018 from the Egina field, located in around 1,600 meters of water depths, 150 kilometers off the coast of Nigeria.

At plateau, the Egina field will produce 200,000 barrels of oil per day, which represents about 10% of Nigeria’s production, GrassRoots.ng gathered.

The Floating Production Storage and Offloading (FPSO) unit used to develop the giant Egina field is the largest one Total has ever built. This project has also involved a record level of local contractors.

Six of the eighteen modules on the FPSO were built and integrated locally, and 77% of hours spent on the project were worked locally.

Startup has been achieved close to 10% below the initial budget, which represents more than 1 billion dollars of CAPEX savings, due in particular to excellent drilling performance where the drilling time per well has been reduced by 30%.

GrassRoots.ng is on a critical mission; to objectively and honestly represent the voice of ‘grassrooters’ in International, Federal, State and Local Government fora; heralding the achievements of political and other leaders and investors alike, without discrimination. This daily, digital news publication platform serves as the leading source of up-to-date information on how people and events reflect on the global community. The pragmatic articles reflect on the life of the community people, covering news/current affairs, business, technology, culture and fashion, entertainment, sports, State, National and International issues that directly impact the locals.

Continue Reading

Trending